PT SWADAYA GRAHA
(SEMEN GRESIK GROUP)
On Going Projects
General Civil Works & Building
|
•
|
Foundation, Support, Gallery Conveyor, Transfer Tower Supply, Fabrication & Installation Belt Conveyor c/w Acc. Facilities Feeding Alternatif Fuel Tuban I - Paket 2, PT Semen Gresik Tbk, 2011 |
| • |
Sekam Storage, Slabing, Supply, Fabrication & Installation Hopper, Pin Gate Facilities Feeding Alternatif Fuel Tuban I - Paket 1, PT Semen Gresik Tbk, 2011
|
| •
|
Culverts Kaliwatu Area Cement Silo & Cement Packer Tuban IV, PT Semen Gresik Tbk, 2011
|
| • |
General Civil for Power Plant Tonasa, PT Rekayasa Industri, 2011
|
| •
|
Pile Cap & Upper Structure Cement Silo Port, PT Semen Tonasa, 2011
|
| • |
Concrete Structure Facilities Fasilitas Clinker Reject Bin, PT Semen Gresik Tbk, 2011
|
| • |
Fabrication & Erection Steel Structure, Architectural Raw Grinding, PT Semen Gresik Tbk, 2011
|
| •
|
Gallery & Hopper Facilities Auxiliary Raw Material Tuban I & II, PT Semen Gresik Tbk, 2011
|
| •
|
Construction of Cigarrete Depot Kreongan - Jember, PT Gudang Garam Tbk, 2011 |
| •
|
Printing Building Unit XI, PT Gudang Garam Tbk, 2011
|
| •
|
Pile Cap & Upper Structure Main Substation Building Tonasa V Package C1201-3, PT Semen Tonasa, 2010 - 2011
|
| •
|
Jetty Packing Plant - Banyuwangi, PT Semen Gresik, 2010 - 2011
|
| •
|
Bored Pile Limestone Crusher, Surge Bin, Gallery Transport from Limestone Crusher to Surge Bin and Long Belt Conveyor Tuban IV, PT Semen Gresik Tbk, 2010 - 2011
|
| •
|
Digester Carbon Brick Linning - Petrokimia, PT Multinas Indonesia - 2011
|
| • |
Foundation, Concrete Structure, Steel Structure Erection, Architectural Facilities Cement Mill & Gypsum Crusher Tuban IV, PT Semen Gresik Tbk, 2010-2011
|
| •
|
Foundation, Concrete Structure, Steel Structure Erection, Architectural for Preheater, Rotary Kiln & EP Cooler, PT Semen Gresik Tbk, 2010-2011 |
| •
|
General Civil Work MNK-2 Cikampek Project, PT IKPT, 2010 - 2011
|
| Steel Fabrication |
| •
|
Fabrication & Erection for Pipe Ducting Support Clinker Cooler to Cement Mill TB-IV, PT Semen Gresik Tbk, 2011 |
| •
|
Fabrication & Steel Erection, Architectural for Preheater Kiln Feed Tuban IV, PT Semen Gresik Tbk, 2011
|
| •
|
Shipping Frame - Eemshaven Power Plant, Alstom Power ESI, 2011
|
| •
|
Fabrication SteelStructureTransport Phase 3, Kiln of Standart, Clinker Silo & Frame Phase 3, PT Semen Gresik Tbk, 2011
|
| •
|
EPC Clinker Transport Conveyor from TB-II to TB-IV, PT Semen Gresik Tbk, 2011
|
| •
|
Fabrication 2B - Air Heater, Bin and Rod Gate, Process Gas Duct, Expansion Joint Stack, Cement Mill Aeroslide Paket A Tuban IV, PT Semen Gresik
Tbk, 2010 - 2011 |
| •
|
Fabrication 2B - Bag Filter, Cement Mill Filter Fan, Bag Filter Cement Mill Package B Tuban IV, PT Semen Gresik
Tbk, 2010 - 2011 |
| •
|
Fabrication Work for Roof Casing & Shipping Fixture of North Battle Project, PT Alstom Power ESI, 2010 - 2011 |
Mechanical & Installation
|
| •
|
Unloading Equipment FA Ex Ecoereen & Install/Erection Spliting Coloumb, PT Wilmar Nabati Indonesia, 2011
|
| •
|
Installation Insulation for Mechanical Construction M2A-3A Proyek Tuban IV, PT Semen Gresik Tbk, 2011 |
| •
|
Repainting Machine, PT Gudang Garam Tbk, 2011
|
| •
|
Rekondition of Clinker Cooler 443CC1 (Over Haul), PT Semen Gresik Tbk, 2011
|
| •
|
Fab of Conveyor Frame, Cover, Shim Plate, Dicharge Chute, Skirt Board for Long Belt Conveyor (Paket 2), PT Semen Gresik Tbk, 2011 |
| •
|
Fab of Conveyor Frame, Cover, Shim Plate, Dicharge Chute, Skirt Board for Long Belt Conveyor (Paket 1), PT Semen Gresik Tbk, 2011
|
| •
|
Lock & Stitching Tire Kiln Tuban I, PT Semen Gresik Tbk, 2011
|
| •
|
Site Erection & Commissioning of Replacement Stacker Reclaimer No. 1 - Paiton Private Power Plant Phase I, Paiton Energy, 2011
|
| •
|
KPI Ammonia Pipe Line Work, PT Kaltim Parna Industri, 2011
|
| •
|
Insulation for Package 2B PIV-5B-M9-PM-002-K, PT Semen Gresik Tbk, 2011
|
| •
|
Demilition, Supply, Fabricationi & Installation MFR/ABC Inlet Cooler TB-III, PT Semen Gresik Tbk, 2011 |
| •
|
Electrical & Instrument Installlation of ID Fan 2 & ABC Inlet Tuban III, PT Semen Gresik Tbk, 2011
|
| •
|
Material Procurement of KPI Ammonia Project Tie-In System, PT Kaltim Nitrate Indonesia, 2011
|
| •
|
Erection Structure Exhaust Gas Conditioning & Coal Crusher Tonasa V (Package C1202-5 & P1202-7), PT Semen Tonasa, 2010 - 2011
|
| •
|
Erection Steel Structure Cement Mill Feed, Clinker Cooler & Clinker Storage Tonasa V Package C1202-4, C1202-8 & C1202-9, PT Semen Tonasa, 2010 - 2011 |
| •
|
Erection Structure Raw Mill, Raw Feed Bin & Coal Mill, Limestone Crusher Tonasa V Package C1202-6, C1202-7 & C1202-5, PT Semen Tonasa, 2010 - 2011
|
| •
|
Foundation Concrete Structure, Fab & Erection Steel Structure, Architectural Gallery Aeroslide for Cement Transport for Cement Mill to Cement Silo, Cement Transport from Cement Silo to Cement Packer Tuban IV, PT Semen Gresik Tbk, 2011 |
| •
|
Mechanical Construction Package M2A-5 Tuban IV, PT Semen Gresik Tbk, 2010 - 2011 |
| •
|
Mechanical Construction Package M2A-1 Raw Mill Paket E - Tuban IV, PT Semen Gresik Tbk, 2010 - 2011
|
| •
|
Erection Equipment Crusher (Clay, Limestone, Silica, Coal) Equipment Raw Mill, Coal Mill & Pyroprocess Tonasa V (Package C2101, C2102 & C2103), PT Semen Tonasa, 2010 - 2011
|
| •
|
Mechanical Fabrication & Construction of Bridge Reclaimer, Portal Reclaimer, Traffeling Tripper for Limestone Storage, PT Semen Gresik Tbk, 2010 - 2011 |
| •
|
Mechanical Construction Package M2A-2 & Steel Erection, Upper Structure Concrete Architectural for Preheater (Preheater Facility Paket 4), PT Semen Gresik Tbk, 2010 - 2011
|
| •
|
Package E - Requistion for Mechanical Construction Package M2B-1, PT Semen Gresik Tbk, 2010 - 2011
|
| Electrical & Instrument |
| •
|
Electricity network Package E2B3 (Finis Mill, Packer dan Substation XIV) Tuban IV, PT Semen Gresik Tbk, 2011
|
| •
|
Package D - Supply & Installation Electrical Equipment & Control WTP TB-IV, PT Semen Gresik Tbk, 2010 - 2011
|
| •
|
Electrical & Instrument for Cement Packer Area Packing Plant Tuban IV, PT Semen
Gresik Tbk, 2010 - 2011
|
|